The
Knight Center

Orange City, IA
client / Unity Christian High School

The Knight Center

at a
glance

2013

completed

29,797

square feet

$4.81m

cost

Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren, no sea takimata sanctus est Lorem ipsum dolor sit amet. Lorem ipsum dolor sit amet, consetetur sadipscing elitr, sed diam nonumy eirmod tempor invidunt ut labore et dolore magna aliquyam erat, sed diam voluptua. At vero eos et accusam et justo duo dolores et ea rebum. Stet clita kasd gubergren

CMBA was chosen to provide master planning services to focus on making Unity Christian’s dreams a reality. Stakeholders determined that a performance space connected to the existing main entry and gym was needed. CMBA began working with teachers and staff to determine their needs and develop a long-range plan for their facility. The master plan that was created includes a 750-seat chapel/theatre, commons area, new music rooms, an additional practice gymnasium, locker rooms, and a new administrative area.

similar
projects